§ 744.108. Water and sewer connections to be made before paving.  


Latest version.
  • JEA (or other water/sewer utility where applicable) shall place or cause to be placed all the necessary water and sewer connections in streets which are to be paved, before they are paved, extending from the water mains and sewers to beyond the curbline in front of lots abutting on such streets, one connection with the water mains and one connection with the sewer mains in front of each lot, so that connection therewith can be made from lots without disturbing the pavement when laid. The cost of the connections shall be paid by property owners to the City or other person making the connection, when the connections are needed for use.

    (Code 1965, § 38-4; Ord. 70-650-526; Ord. 71-397-181; Ord. 83-591-400, § 1; Ord. 90-36-24, § 2; Ord. 2008-513-E, § 1)

    Note— Former § 604.106.